This machine was continuosly overhauled within the past 10 years.
- 2003 general retrofit of the shear and exchange of bearings.
- 2006 general overhaul of straightening unit.
- Incl. Aluminium cutting and stacking device.
- Time for coilchange only 4 min.
U200 VIDEOS youtube
Technical description
Within 8 hours 5000 units of 4 meter blanks for sidepanels were manufactures
Max strokes 120 per minute
This line consists of:
- Coil loading device
- One sided winder/hasp
- Interslotting and extractor device
- Cropping shear
- Burr removing device
- Washing unit
- Stretcher-Leveller machine
- Supply loop
- Roll feed attachment
- Restly strip expeller
- Weld seam detector
- Electronic swivel shear +/- 30°
- Conveyor device
- 2 Stacking stations
- Scrap carriage